Structural & Site Restoration Division

CN Tower

Location:  Toronto, ON | Completion Date: December, 2019 | Owner: City of Toronto | Consultant: NCK Engineering  
Type: Concrete Rehabilitation, Waterproofing 
General Structural Rehabilitation Project. Repair of the level 8 heating cable system in one zone. Removal of concrete topping, installation of new heating cables (by others), re-installation of new concrete topping and waterproofing. Contract changed from removal of top portion of topping to removal in its entirety, as topping was more severely de-laminated than originally expected.

December - 2019

Tim Hortons

Location: Hamilton, ON | Completion Date: January, 2018 | Owner: City of Hamilton | Consultant: WSP Group  
Type: General Structural Rehabilitation Project 
Restoration of the Tim Horton's Centre Stadium in Hamilton.  Works on site include, pre-cast cast joint renewal, installation of DSM joints, thin system waterproofing, drain installation, caulking and other miscellaneous works.

January - 2018

Sherway Fountain

Location: 205 Sherway Dr., Toronto, ON | Completion Date: May, 2020 | Owner: City of Fountain Place (On behalf of Condo Corporation) | Consultant: Sense Engineering  
Type: Concrete Rehabilitation, Waterproofing
Design Build Restoration of the condominium fountain with fountain specialist company fountain place.  Demolition of existing water feature components, reinstatement of all finishes.

May - 2020

Mutual Street Garage

Location: 25 Mutual St., Toronto, ON | Completion Date: December, 2014 | Owner: Toronto Community Housing Corporation | Consultant: WSP  
Type: Concrete Rehabilitation, Waterproofing 
Parking Garage Restoration Project. Rehabilitation of 4500 sq/ft of parking garage roof slab (3 phases).  Removal of overburden, concrete repair, application of waterproofing, and reinstatement of overburden to match new proposed layout.  Also, various miscellaneous repairs, including drain removal/installation, crack injection, etc.

December - 2014

King St. Parkade

Location: Peterborouigh, ON | Completion Date: December, 2016 | Owner: City of Peterborough | Consultant: Read Jones Christoffersen
Type: Concrete Rehabilitation, Waterproofing
Parking Garage Restoration Project. Structural concrete repairs and localized thin system waterproofing repair throughout multi-level precast parking garage. Various other misc. repairs including expansion joint repair, crack injection, sealant repair etc.

December - 2016

Guelph West Parkade Phase 1-2

Location: Guelph, ON | Completion Date: December 2015 | Owner: City of Guelph | Consultant: Brown and Beattie Ltd.
Type: Parking and Related Services Project
The West Parkade is one of the Guelph’s municipal parking facilities. HRI completed wholesale sealant and thin system waterproofing installation on the top interior level of multi level pre-cast parking garage. We also completed various structural concrete repairs throughout, as well as other miscellaneous repairs which included; expansion joint replacement, drain replacements, installation of roof deck epoxy thin system test area etc.

December - 2015

TCHC St. Andrews Phase 1-3

Location: Toronto, ON | Completion Date: July 2017 | Owner: Toronto Community housing Corporation | Consultant: Stephenson Engineering
Type: Parking and Related Services Project
TCHC St. Andrews is a multi-residential high rise building complex located at 2063/2067 Islington Ave. HRI completed removal and replacement of thin system intermediate slab waterproofing. We also addressed localized roof slab overburden removal/replacement for re-application of hot applied waterproofing system. Various structural concrete repairs, drain replacements, replacement of expansion joints, crack injection and other miscellaneous repairs were also completed throughout.

July - 2017

TCHC Rowntree Phase 1-3

Location: Toronto, ON | Completion Date: August 2017 | Owner: Toronto Community housing Corporation | Consultant: WSP Group
Type: Parking and Related Services Project
The TCHC Rowntree Building is a multi-residential high-rise building located at 2765 Islington Ave. HRI completed removal and replacement of thin system intermediate slab waterproofing. We also addressed localized roof slab overburden removal/replacement for re-application of hot applied waterproofing system. Various structural concrete repairs, drain replacements, replacement of expansion joints, crack injection and other miscellaneous repairs were also completed throughout.

August - 2017

The Anchorage

Location: Belleville, ON | Completion Date: December 2016 | Owner: Royal Property Management (Representative on behalf of Condo Corporation) | Consultant: Edison Engineers
Type: Parking and Related Services Project
The Anchorage is one of Belleville’s most highly sought after condominium buildings. Its garage is composed of a single on grade level, with a conventional slab elevated podium deck level above. HRI completed removal of all of overburden on the suspended slab. We then repaired the structural slab, installed a hot applied waterproofing system, and finally, a sloped asphalt padding and asphalt top course along with reinstatement of all hard landscaping overburden (sidewalks, ramps etc). Various miscellaneous garage repairs were completed including column repairs, vertical repairs, drainage repairs, railings, trench drain replacement etc.

December - 2016

Mississauga City Centre

Location: Mississauga, ON | Completion Date: September 2016 | Owner: City of Mississauga | Consultant: Stephenson Engineering
Type: Infrastructure Restoration Services Project
The City Centre Transit Terminal is located adjacent to the Square One Shopping Centre, making it one of the City of Mississauga’s highest traffic public transportation hubs. HRI completed removal of all of overburden on suspended podium deck portion of the transit terminal bus loop. Concrete repairs and application of hot applied waterproofing system were then completed. Finally, HRI Reinstated all bus loop overburden including granular, concrete topping, asphalt, curbs, stamped concrete etc.

September - 2016

TCHC Eglinton

Location: Toronto, ON | Completion Date: January 2017 | Owner: Toronto Community Housing Corporation | Consultant: R and C Engineering
Type: Parking and Related Services Project
The TCHC Eglinton Building is a multi-residential high-rise building located at 220 Eglinton Ave. E. Works included removal of overburden and all underground garage services, full P1 roof slab replacement and reinstatement of garage waterproofing/overburden/and services. Various other miscellaneous repairs within the parking garage, including steel beam
replacement and repairs, fireproofing, concrete and drainage repairs, etc, were also completed.

January - 2017

Simcoe Street Parkade

Location: Peterborough, ON | Completion Date: December 2016 | Owner: City of Peterborough | Consultant:  RJC Engineering
Type: Parking and Related Services Project
The Simcoe St. Parkade is one of the City of Peterborough’s municipal parking facilities. HRI completed structural concrete repairs and localized thin system waterproofing replacement throughout multi level pre-cast parking garage. Various other misc. repairs including replacing expansion joints, crack injection, sealant repair, stairwell upgrades etc., were also completed.

December - 2016

Wilson Heights

Location: 750 Wilson Heights Blvd., Toronto ON | Completion Date:  November, 2017 | Owner:  Toronto Community Housing | Consultant: Stephenson Engineers
Type: Parking Garage Restoration Project
Replacement of concrete garage access ramp, including new heating cable system and trench drain. Other miscellaneous repairs including podium deck drain replacement, crack injection, crystalline waterproofing, podium deck waterproofing asphalt replacement, etc.

November - 2017

Building Envelope & Historical Rehabilitation Division

Willistead Manor

Location:  350 City Hall Square West, Windsor, ON | Completion Date: May , 2018 | Owner: Newman Centre | Consultant: NORR Architects | Type: Prime Contractor
Wood Window Conservation, Masonry, Sheet Metal Works
Building Envelope Rehabilitation Project. Historical facade restoration and conservation works including, but not
limited to, major window conservation works, wood dutchman repairs, paint removal and re-painting, glazing, glass
repairs, sill replacement as well as minor masonry and roofing/sheet-metal repairs.
Major civil scope added to the project midday through. This added in excavation, foundation repairs, drainage, backfill,
concrete works such as curbs and sidewalks as well as paving and site restoration including grading, sod, and
landscaping.

MAY - 2018

Johnston Hall

Location: University of Guelph - Guelph, ON | Completion Date: August, 2019 | Owner: Newman Centre | Consultant: NORR Architects | Type: Prime Contractor
Wood Window Conservation, Masonry, Sheet Metal Works
Building Envelope Rehabilitation Project. Historical facade restoration and conservation works including, but not
limited to, major window conservation works, wood dutchman repairs, paint removal and re-painting, glazing, glass
repairs, sill replacement as well as minor masonry and roofing/sheet-metal repairs.
Major civil scope added to the project midday through. This added in excavation, foundation repairs, drainage, backfill,
concrete works such as curbs and sidewalks as well as paving and site restoration including grading, sod, and
landscaping.

August - 2019

York University

Location: University of Guelph - Guelph, ON | Completion Date: August, 2019 | Owner: Newman Centre | Consultant: NORR Architects | Type: Prime Contractor

Conservation of a historical wrought iron fence and gate as well as limestone restoration and repair to the entrance gates and pillars.

July - 2017

Newman Centre
Interior Renovations

Location: 50 Hoskin Avenue, Toronto, ON | Completion Date: April , 2018 | Owner: Newman Centre | Consultant: NORR Architects | Type: Prime Contractor 
Interior Renovations including, but not limited to, demolition, shoring, abatement, electrical, mechanical, masonry
alterations, framing, carpet and tile, concrete forming, pouring and finishing, metals and handrails, painting and
refinishing of walls, pew alterations and refinishing.

April - 2018

St. Mary's Church
Complete Building Rehabilitation

Location: Toronto, ON | Completion Date: June, 2015 | Owner: Arch Diocese of Toronto | Consultant: Larkin Architects & Ojdrovic Engineering
Type: Masonry Rehab Services Project | Historical Roofing & Sheet Metal Services Project | Millwork & Historical Window Services Project
The historic St Mary’s Church is located at 130 Bathurst Street in Toronto. The church was constructed in 1889 with the tower being finished in 1905. The church is a solid masonry building constructed using buff brick and limestone. Heritage Restoration Inc. completed a wide array of restoration at St Mary’s Church over multiple phases. The scope of work included large scale brick replacements, carved stone replacements, pinnacle replacements, slate roof replacement, copper flashings and sheet-metal cladding, full exterior waterproofing, courtyard landscape stone work, foundation repair and waterproofing, structural upgrades to the roof and foundations, paving, concrete ramps, stairs and steps, new interior and exterior doors as well as complete interior renovations included washrooms, drywall, new pews, painting, tile work, electrical and mechanical. HRI worked as part of a team with the consultant and the owner to provide a high quality finished product that was presented an award from the Architecture conservatory association after its completion.

june - 2015

Stanley Barracks
Window Conservation Works

Location: 115 Princess Blvd., Toronto, ON | Completion Date:  November, 2019 | Owner:  Hotel X | Consultant:  ERA Architects Inc. | Type: Prime Contractor
Strip paint, frame and sash consolidation, glass replacement, window glazing, painting.
- Window replication where required. Minor in scope as many of the original windows were conserved.
- Minor masonry re-pointing
- Steel roof repairs and painting
- Scaffolding access and tarping

November - 2019

Spadina Museum
Coach House Roof Replacement and Main House Roof Replacement

Location: Toronto, ON | Completion Date: June 2015 and August 2016 | Owner: City of Toronto | Consultant: Taylor Hazel Architects
Type: Historical Roofing & Sheet Metal Services Project | Millwork & Historical Window Services Project
HRI completed two projects at the Historical Spadina Museum located in Toronto, ON. The first project scope included removal and replacement of the cedar shingle roofing system, new gutters and downspouts, as well as wood restoration and painting on the Coach House. The second project included removal and replacement of the cedar shingle roofing system including new gutters, downspouts and associated sheet metal works to the main house.

June-2015 & August-2016

Victoria Park Armoury Phase 1-2
Exterior Building Envelope

Location: Lindsay, ON | Completion Date: August 2016 | Owner: City of Kawartha Lakes | Consultant: Stevens Burgess Architects and Tacoma Engineering
Type: Masonry Rehab Services Project | Historical Roofing & Sheet Metal Services Project | Millwork & Historical Window Services Project
The Armoury is a listed Heritage building with the City of Kawartha Lakes and is located in the City of Lindsay. The project consisted of two phases with the first being the North Elevation and the second being the South. The building remained operational for the entire project. The scope of work included brick and stone masonry repair/replacement, window replacement, flat and shingle roofing, rough carpentry; interior finishes as well as custom historical sheet lead work.

August-2016

City of Kawartha Lakes Phase 1-2
City Hall Building Envelope

Location: Lindsay, ON | Completion Date: May 2017 | Owner: City of Kawartha Lakes | Consultant: Vetin Group (VG+) and Tacoma Engineering
Type: Masonry Rehab Services Project | Historical Roofing & Sheet Metal Services Project | Millwork & Historical Window Services Project
City Hall is a listed Heritage Building with the COKL. This building is one of the three judicial buildings designed by the influential Toronto Architect firm of Frederick Cumberland and William Storm. The building remained operational during all of the restoration work, which included various masonry works, complete slate roof replacement, flat roofing replacement, wood window repair and other miscellaneous works.

May-2017

Buckhorn Lock 31
Masonry Stabilization and Restoration

Location: Buckhorn, ON | Completion Date: May 2017 | Owner: Parks Canada | Consultant: JG Cooke and Associates
Type: Masonry Rehab Services Project
Lock 31 – Buckhorn is a large solid masonry lock on the historic Trent Severn waterway, one of the busiest locks on the Trent. This project included the installation of an engineered cofferdam and full dewatering of the lock. Once dry, a full review of the masonry walls was conducted with the consultants to determine the full extent of the work. The masonry scope included 100% repointing, stone Dutchman repairs, large scale custom stone replacement, and low pressure grouting of the lock walls.

May-2017

Regent Theatre
Interior Plaster Conservation

Location: Oshawa, ON | Completion Date: August 2013 | Owner: University of Ontario Institute and Technology | Consultant: University of Ontario Institute and Technology
Type: Masonry Rehab Services Project
The Regent Theatre is located in downtown Oshawa and was built in 1913. It is a designated Heritage building with the City and now currently owned by the University. The scope of work included conservation and repair of the remaining heritage plaster elements. From these restored elements the entire theatre ceiling was recreated to match the existing. Although not much of the existing was retained the original elements were incorporated into the existing ceiling to retain as much of the original as possible.

August-2013

St. Basil Church
Interior Sanctuary Repainting

Location: Toronto, ON | Completion Date: March 2017 | Owner: Archdiocese of Toronto | Consultant: Larkin Architects
Type: Masonry Rehab Services Project
St. Basil’s Church, built in 1856, is the founding church of the Congregation of St. Basil in Toronto, the college church of St. Michael's College, Toronto, and a parish church serving a large local congregation. The church remained operational during the multi-phased project consisting of full scaffold erection complete with containment, to allow for plaster repairs, surface preparation and painting of walls ceiling and columns.

march-2017

180 John St.
Exterior Building Restoration and Addition

Location: 180 John St., Toronto, ON | Completion Date:  July 2017 | Owner: Bosko Verity (Construction Manager on behalf of Allied Properties) | Consultant: RJC/Gensler Architecture
Type: Trade Contractor
Masonry - Building Envelope Rehabilitation Project. Assembly of full facade scaffold for extensive masonry restoration including
masonry cleaning, brick replacement, reconstruction of brick returns, tuck-pointing and decorative pre-cast
replacement. Various other miscellaneous repairs.

july-2017

Shoppers Drugmart
Building Envelope Rehabilitation Project

Location: 728 Yonge St., Toronto, ON | Completion Date:  March, 2020 | Owner:  MC (General Contractor on behalf of Shoppers Drugmart) | Consultant:  ERA Architects
Type: Sub-contractor
Historical facade restoration and conservation works including, but not limited to, major masonry disassembly and salvage, brick replacement, re-pointing, parapet reconstruction, paint stripping, installation of heritage replica windows, sheet metal cornice work and masonry cleaning. 

March - 2020